Pages

Wednesday, June 1, 2011

Wednesday List of Things to Do Thursday


  1. Still waiting on word of the Put A RING on it harddrive drive arriving in Lousiana. My tracking confirmation says it was delivered yesterday. In the meantime, I’m continuing to tweak the Put A Ring on It edit. However, I’m fast approaching the point of aimless tinkering. I don’t want to get much further into color correction if a post house is going to handle it. Same with sound design. Sure there’s more I could do, but if my work is going to be thrown aside anyway, why bother? So what was the point of this number? Oh, yeah. Go over final color correction at least double check that everything is within broadcast safe. Also check sound levels for the same.
  2. Go over Trap edit. I’m submitting it to festivals. I need to make sure the cut is tip top.
  3. Go over Monsters in the Woods edit. Same thing.
  4. Go over the rest of EXIT. I’m going to repackage my horror trilogy. I think I’m at a place now where I can successfully put these projects together.  If I’m not too burnt out, I’ll jump right into Chophouse as well.
  5. Do a preliminary budget break-down for EXIT, CHOPHOUSE AND THE WORM.  My plan over the next month is to have compete breakdowns and schedules for all three projects.

0 comments:

Post a Comment